Back to blog
Test Strategy

Building a Regression Suite That Actually Gets Run

Most regression suites are written once and slowly abandoned. The problem is usually not the test cases — it is the process around running them. Here is how to build one your team will actually use.

MR
Maya R.
Senior QA Engineer
7 min readApril 28, 2025

The regression suite graveyard

Every QA team I've joined has a regression suite graveyard: a folder full of Excel spreadsheets or a Jira epic with 300 test cases labeled "regression" that nobody has run in 6 months.

Why does this happen?

  1. 1The suite is too big to run before every release
  2. 2Ownership is unclear — no one feels responsible for keeping it updated
  3. 3Running it is manual, time-consuming, and depressing
  4. 4When it fails, nobody knows if the failure is a real bug or a stale test case

Here's how to build one that avoids all four failure modes.


Start small and focused

A regression suite should cover the most important user journeys — not every test case you've ever written.

The right question is: "If this breaks in production and nobody catches it before release, how bad is the damage?"

For most products, this is 20–40 test cases, not 300.

Categories to include:

  • Authentication: Login, logout, session expiry, password reset
  • Core user journey: The 2–3 things users do every single day
  • Billing and payments: Anything that touches money
  • Data integrity: Creates, updates, and deletes that touch the database
  • Integration touchpoints: Anything that relies on a third-party API

Everything else is a candidate for a separate, less-frequently-run suite.


Assign ownership, not authorship

"The QA team owns regression testing" means no individual feels responsible. Assign each suite to a specific person who is accountable for:

  1. 1Keeping test cases current when the feature changes
  2. 2Triaging failures to determine bug vs. stale test
  3. 3Running the suite before each release

Rotation works well: own the regression suite for one sprint, hand it to a colleague for the next.


Define your run cadence

Suite typeRun frequency
Smoke (10–15 cases)Before every deploy
Core regression (30–50 cases)Every sprint, before release
Full regression (all cases)Major releases, once per quarter

Don't try to run everything before every deploy. The suite won't get run at all.


Make failures actionable

When a test case fails, the runner needs to quickly determine:

Is this a real bug?

  • Can I reproduce it manually?
  • Does it happen in staging too?
  • Was there a recent code change in this area?

Or is this a stale test case?

  • Did the feature behavior intentionally change?
  • Is the expected result still accurate?
  • Does the test need to be updated?

Document the answer in the test run. A "fail" with no comment is useless to the next person who runs the suite.


Using softAssert for regression suites

softAssert's suite execution tracks pass/fail history over time, so you can see trends: is this particular test case flaky? Did pass rate drop after a specific sprint?

You can also link bug reports to failing test cases, so when a bug is fixed, you can verify it in context and update the test case if needed.

The goal is a living document, not a frozen artifact.


The minimal viable regression process

  1. 1Identify your top 30 user journeys
  2. 2Write or generate test cases for each
  3. 3Group them into a suite with a clear owner
  4. 4Run it before every release
  5. 5Update it when features change
  6. 6Review and prune it every quarter

That's it. No automation required. No complex tooling. Just a consistent process that actually happens.

Automation can come later — and it will be much easier to build when you have a solid manual suite as the foundation.

Try softAssert free

Generate test cases, file bugs, and run regression suites — no credit card needed.

Get started free